Implementations List

Novokuibyshevsk CHP-1 - фото - 3
Novokuibyshevsk, Samara region, Russia
Connected to the system
  • 3 gas turbines General Electric PG 6111 FA
  • 3 heat recovery boilers, including water chemistry conditions, Belenergomash-BZEM LLC, KGT-119/10-510-18/0.8-210
  • 3 gas booster compressors GEA Grasso GmbH, EGSI-S-470/2600 WA
Syzran CHP - фото - 1
Syzran, Samara region, Russia
Connected to the system
  • 2 gas turbines General Electric PG 6111 FA
  • 1 steam turbine Siemens SST-600
  • 2 heat recovery boilers, including water chemistry conditions, IEG, Istroenergo Group, KUP-110/15
  • 3 gas booster compressors GEA Grasso GmbH, EGSI-S-350/1600WA
Perm CHP-6 - фото - 1
Russia, Perm Krai, Perm
Connected to the system
  • 2 gas turbines Siemens SGT-800
  • 1 steam turbine Siemens SST-600 NK
  • 2 heat recovery boilers, including water chemistry conditions, HRSG BBS (Badcock Borsig Steinmuller CZ sr.r.o.)
  • 3 gas booster compressors Howden mk1as wrvihn 365 — 19344
Perm CHP-9 - фото - 1
Russia, Perm Krai, Perm
Connected to the system
  • 1 gas turbine GTE-160 V94.2 v.7, Power Machines PJSC
  • 1 heat-recovery boiler, including water chemistry conditions, TKZ Krasny Kotelshchik JSC EMA-019
  • 1 gas booster compressor BORSIG T-Jet 70-4
Vladimir CHP-2 - фото - 1
Russia, Vladimir region, Vladimir
Connected to the system
  • 1 gas turbine GTE-160 V94.2 V.7, Power Machines PJSC
  • 1 steam turbine T-63/76, UTW JSC
  • 1 heat-recovery boiler, including water chemistry conditions, TKZ Krasny Kotelshchik JSC, EMA-031-KU (Е-236/41-6.3/1.5-521/298)
  • 1 gas booster compressor BORSIG T-Jet 70-4
  • 1 gas booster compressor BORSIG T-Jet 45-3
Izhevsk CHP-1 - фото - 1
Russia, Republic of Udmurtia, Izhevsk
Connected to the system
  • 1 gas turbine GTE-160 V94.2 V.7, Power Machines PJSC
  • 1 steam turbine T-63/76-8.8, UTW JSC
  • 1 heat-recovery boiler, including water chemistry conditions, EMAlliance JSC E-236/40.5-520/299-22.2vv
  • 2 gas booster compressors BORSIG T-Jet 70-4
Kirov CHP-3 - фото - 1
Russia, Kirov region, Kirovo-Chepetsk
Connected to the system
  • 1 gas turbine GTE-160 V94.2 V.7, Power Machines PJSC
  • 1 steam turbine T-63/76, UTW JSC
  • 1 heat-recovery boiler, including water chemistry conditions, EMAlliance JSC E-236/40.2
Akademicheskaya CHP - фото - 1
Russia, Sverdlovsk region, Yekaterinburg
Connected to the system
  • 1 gas turbine Alstom GT13E2
  • 1 steam turbine UTW JSC КТ-63-7,7
  • 1 heat-recovery boiler, including water chemistry conditions, Podolsk Machine-Building Plant JSC (ZiO JSC) E-208/50.1-7.55/1.19-467/274
  • 2 gas booster compressors Borsig ZM Compression GmbH T-Jet 45-3
Novogorkovskaya CHP - фото - 1
Russia, Nizhny Novgorod Region, Kstovo
Connected to the system
  • 2 gas turbines Alstom GT13E2
  • 2 heat recovery boilers, including water chemistry conditions, Podolsk Machine-Building Plant JSC (ZiO JSC) E-293/40.2-14/1.5-560/294 D (PK-85)
  • 2 gas booster compressors BORSIG T-Jet 70-4
  • 1 transformer TDC-225000/220 T11, Zaporozhtransformator PJSC
  • 1 transformer TDC-225000/110 Т12, Zaporozhtransformator PJSC
  • 1 transformer TRDNS-25000/15 UHL1 (TSN12) SVEL — Power Transformers Plant,
  • 1 transformer TRDNS-25000/15 UHL1 (TSN11) SVEL — Power Transformers Plant
  • 1 transformer TRDN-25000/110 UHL 1 (TSN (standby)) SVEL — Power Transformers Plant.
Nizhneturinskaya SDPP - фото - 1
Russia, Sverdlovsk region, Nizhnyaya Tura
Connected to the system
  • 2 gas turbines Alstom GT13E2
  • 2 steam turbines КТ-63-7,7, UTW JSC
  • 2 heat recovery boilers, including water chemistry conditions, Podolsk Machine-Building Plant JSC (ZiO JSC) E-204/48.6-7.42/1.19-467/274 (PK-87)
Kazan CHP-1 - фото - 1
Russia, Republic of Tatarstan, Kazan
Connected to the system
  • 2 gas turbines General Electric PG6111FA
  • 2 steam turbines UTW JSC, Kt-46-8.8
  • 2 heat recovery boilers, EMAlliance JSC ED-160/14-9.0/0.7-525/210
  • 3 gas booster compressors, ATLAS Copco GT032T4D1
CHP-27 - фото - 1
Russia, Moscow
Connected to the system
  • 2 gas turbines Siemens ГТЭ-160 V94.2 в.2
  • 1 steam turbine Т-125-50
  • 2 heat recovery boilers ZiO-Podolsk JSC P-107
  • 5 gas booster compressors PCU-VM
Make your first step in the digital economy
Leave your phone number and our expert will contact you for consultation
Your phone number *

© PRANA: Predictive Analytics and Remote Monitoring System, 2024

15 Nikoloyamskaya St., Moscow,
109240, Russia