Kazan CHP-1

We describe the implementation of PRANA predictive analytics system at Kazan CHP-1. 2 gas turbines, 2 steam turbines, 2 heat-recovery boilers, 3 gas booster compressor stations were connected to the system.
Kazan CHP-1 - фото - 1
Russia, Republic of Tatarstan, Kazan
Kazan CHP-1 - фото - 1
Connected to the system
  • 2 gas turbines General Electric PG6111FA
  • 2 steam turbines UTW JSC, Kt-46-8.8
  • 2 heat recovery boilers, EMAlliance JSC ED-160/14-9.0/0.7-525/210
  • 3 gas booster compressors, ATLAS Copco GT032T4D1

A.G. Filimonov, Head of Production and Technology Diretorate of Tatenergo JSC:

Introduction of the PRANA system at Kazan CHP-1 is likely to become a new unique experience in introducing such systems of domestic development, which, according to the results of pilot production, can be replicated to the whole range of power equipment of enterprises in the industry.

Make your first step in the digital economy
Leave your phone number and our expert will contact you for consultation
Your phone number *

© PRANA: Predictive Analytics and Remote Monitoring System, 2024

15 Nikoloyamskaya St., Moscow,
109240, Russia