We describe the implementation of PRANA predictive analytics system at Perm CHP-6. 2 gas turbines, a steam turbine, 2 heat-recovery boilers, 3 gas booster compressor stations were connected to the system.
Russia, Perm Krai, Perm
Connected to the system
2 gas turbines Siemens SGT-800
1 steam turbine Siemens SST-600 NK
2 heat recovery boilers, including water chemistry conditions, HRSG BBS (Badcock Borsig Steinmuller CZ sr.r.o.)
3 gas booster compressors Howden mk1as wrvihn 365 — 19344