We describe the implementation of PRANA predictive analytics system at Kirov CHP-3. A gas turbine, a steam turbine, a heat-recovery boiler were connected to the system.
Russia, Kirov region, Kirovo-Chepetsk
Connected to the system
- 1 gas turbine GTE-160 V94.2 V.7, Power Machines PJSC
- 1 steam turbine T-63/76, UTW JSC
- 1 heat-recovery boiler, including water chemistry conditions, EMAlliance JSC E-236/40.2