We describe the implementation of PRANA predictive analytics system at Vladimir CHP-2. A gas turbine, a steam turbine, a heat-recovery boiler, 2 gas booster compressor stations were connected to the system.
Russia, Vladimir region, Vladimir
Connected to the system
- 1 gas turbine GTE-160 V94.2 V.7, Power Machines PJSC
- 1 steam turbine T-63/76, UTW JSC
- 1 heat-recovery boiler, including water chemistry conditions, TKZ Krasny Kotelshchik JSC, EMA-031-KU (Е-236/41-6.3/1.5-521/298)
- 1 gas booster compressor BORSIG T-Jet 70-4
- 1 gas booster compressor BORSIG T-Jet 45-3