We describe the implementation of PRANA predictive analytics system at Perm CHP-9. A gas turbine, a heat-recovery boiler, a gas booster compressor station were connected to the system.
Russia, Perm Krai, Perm
Connected to the system
1 gas turbine GTE-160 V94.2 v.7, Power Machines PJSC
1 heat-recovery boiler, including water chemistry conditions, TKZ Krasny Kotelshchik JSC EMA-019